1           Introduction

The plan is prepared by CCC-CCECC-CR11G Joint Venture (3CJV) for Contract No. NL/2023/11 Tung Chung New Town Extension – Infrastructure Works at Tung Chung Valley, Phase 2 in accordance with the Condition 2.12 of the Environmental Permit No. EP-519/2016 dated 9 August 2016.

1.1         Project Background

The development of Tung Chung New Town Extension (TCNTE), comprising Tung Chung East (TCE) and Tung Chung West (TCW), is a mega-scale and complex project aiming to provide land to meet the future housing economic and social development needs of Hong Kong. Due to the fact that the proposed works are geographically separated, the implementation of mega-scale Project is divided into two packages, namely TCE and TCW respectively. In accordance with the tight delivery programme, the Project will be implemented in phases under separate contracts for the developments of TCE and TCW.

1.2         Scope of Works

The works to be executed under the contract involve infrastructure works at Tung Chung Valley, Phase 2 in Tung Chung New Town Extension, as described below:

(a)         Construction of Road L25, Road L26 and Road L28;

(b)         Construction of sewage pumping station (Tung Chung Valley (West));

(c)         Construction of village sewerage at Lam Che, Nim Yuen, Shek Lau Po, Mok Ka and Shek Mun Kap;

(d)         Construction of sustainable urban drainage system, stormwater attenuation & treatment pond at Tung Chung Area 45C;

(e)         Construction of polders;

(f)          Construction of Tung Chung River Park (Phase 2);

(g)         Reprovisioning of Shek Mun Kap Public Toilet and refuse collection point;

(h)         Ancillary works including associated civil, geotechnical, drainage, sewerage, water supply, electrical and mechanical engineering and landscaping works; and

(i)           Implementation of environmental mitigation measures for the works mentioned above.

1.3         Implementation Programme

 

The implementation programme will follow the construction works schedule referred in Appendix A and the location plan is shown in Appendix B.

 

 

 

 

 

 

(END)

 

 

 

 

 