The plan
is prepared by China Railway Engineering Group Limited (known as CREC) in
accordance with the Condition 2.12 of the Environmental Permit No. EP-519/2016
dated 09/08/2016.
The development of Tung Chung New Town Extension
(TCNTE), comprising Tung Chung East (TCE) and Tung Chung West (TCW), is a
mega-scale and complex project aiming to provide land to meet the future
housing economic and social development needs of Hong Kong. Due to the fact that the proposed works are geographically separated, the
implementation of mega-scale Project is divided into two packages, namely TCE
and TCW respectively. In accordance with the tight delivery programme,
the Project will be implemented in phases under separate contracts for the
developments of TCE and TCW.
(a) Site clearance (including, but not limited to, the demolition of the existing building structures);
(b) Site formation works for Area 42 and Area 46 with associated geotechnical works;
(c) Improvement works for Chung Mun Road and Shek Mun Kap Road with associated infrastructural and geotechnical works;
(d) Provision of infrastructural works at Yu Tung Road;
(e) Construction of Road L29 and Road L30 with associated infrastructural and geotechnical works;
(f) Provision of attenuation & treatment ponds;
(g) Provision of a Common Utility Trough and box culvert along Road L29;
(h) Provision of Pumping Stations;
(i) Construction of a proposed River Park with Visitor Centre, footbridge across river and other associated facilities;
(j) Provision of roadside Sustainable Urban Drainage System (SUDS) features;
(k) River de-channelization works;
(l) Construction of noise barriers;
(m) Woodland Compensation;
(n) Associated landscaping works;
(o) Tree felling, transplanting and compensatory planting works;
(p) Ground investigation, geotechnical and building instrumentation monitoring works; and
(q) Other works which are shown on the
Drawings or specified in the Specifications.
The implementation programme will follow the construction works schedule referred in Appendix A and the location plan is shown in Appendix B.
(END)
Appendix A – Construction Works Schedule
Appendix B – Site Location
Plan