The plan is prepared by China Railway Engineering Group Limited (known
as CREC) in accordance with the Condition 2.12 of the Environmental Permit No.
EP-519/2016 dated 09/08/2016.
(a) Site clearance (including, but not limited to, the demolition of the existing building structures);
(b) Site formation works for Area 42 and Area 46 with associated geotechnical works;
(c) Improvement works for Chung Mun Road and Shek Mun Kap Road with associated infrastructural and geotechnical works;
(d) Provision of infrastructural works at Yu Tung Road;
(e) Construction of Road L29 and Road L30 with associated infrastructural and geotechnical works;
(f) Provision of attenuation & treatment ponds;
(g) Provision of a Common Utility Trough and box culvert along Road L29;
(h) Provision of Pumping Stations;
(i) Construction of a proposed River Park with Visitor Centre, footbridge across river and other associated facilities;
(j) Provision of roadside Sustainable Urban Drainage System (SUDS) features;
(k) River de-channelization works;
(l) Construction of noise barriers;
(m) Woodland Compensation;
(n) Associated landscaping works;
(o) Tree felling, transplanting and compensatory planting works;
(p) Ground investigation, geotechnical and building instrumentation monitoring works; and
(q) Other works which are shown on the Drawings or specified in the Specifications.
The implementation programme will follow the construction works schedule referred in Appendix A and the location plan is shown in Appendix B.
(END)